1450 MW Ghazi-Barotha Hydropower Project - Picture#1
NESPAK, as lead firm of the joint venture for the Ghazi-Barotha Hydropower Project, undertook feasibility studies, designs and preparation of tender documents, and is now providing construction supervision for the project.
1450 MW Ghazi-Barotha Hydropower Project - Picture#2
1450 MW Ghazi-Barotha Hydropower Project - Picture#3
Extension Project undertook detailed design, preparation of tender documents and construction supervision for Units 11-14 . The project was designed to generate 1,728 MW on Tunnel-3 enhancing total capacity of the power house to 3,478 MW. |
|